Saturday, 18 October 2014
18th October.
Good work party today, see photos, also given a £400 cheque this week from Shepherds, see photo.In just over a month we have received £1000 in donations, let's hope this continues! Thanks to all who have donated or bought stock, only 130 calendars left!
Saturday, 4 October 2014
4th of October.
Small work party today, but a lot done, see pictures.Shed is now almost leak proof, it was well tested today! The next stage is to lift the body off the steels. We have found a crane for the tram shelter, so soon 53 and a tram shelter will be reunited. The pictures show a micro wave for cooking in the food cupboard, the last two steels for the front platform were drilled and primed, a white board has appeared for work records and Allan has lifted the other cab floor.
Sunday, 14 September 2014
Saturday, 13 September 2014
13th September.
A well attended work party today, shock horror! Myself, Malcolm, Tony, George and Brian plugged roof leaks, finished the guttering, ripped up more floorboards and prepared the area for the tram shelter, well done lads.
Sunday, 7 September 2014
Subscribe to:
Posts (Atom)
