Three of us out at 53 today, Allan, Malcolm and El Presi. The remainder of the floor was taken up and an across wood piece was unbolted and examined. The bolts and the wood are fine, so Malcolm is going to overhaul the wood, whilst the bolts will be cleaned up and re-used. The metal work was fine, so that be cleaned, repainted and ready! Malcolm also took more of the side strapping off, so the side panels can be removed and the metal work of the frame examined.Two concrete sleepers were put in position for the shed extension, a busy day indeed. Allan will do a report on this shortly. John the farmer had dropped off an old railway rail, I believe he has another so with a few sleepers we have some track....