Sunday 21 June 2015
20th of June.
53's wooden body was raised above the steel frame to allow welding and other works to be done, see photos. Once these are finished , we can drop the frame back down and reconstruction can really start, a good days work with a great cake baked for us by Irene!
Saturday 13 June 2015
13th of June.
More work out at 53, see pictures. preparing for the big lift next week and also the final bits of de-rusting and priming were done and a new desk added to the shed.
Subscribe to:
Posts (Atom)