Saturday 14 May 2016
14th of May 2016
More work on site, see pictures, one of the cab end floors is ready to bolt on, see pictures.
Sunday 1 May 2016
More work on 53, 30th of April.
Five of us were on site on the 30th, Guy, Brian, Malcolm, Simon and Phil. Simon continued to measure up 53, whilst Brian repaired the broken roof sheeting and the rest of us screwed in the door surround as well as painting, etc. Malcolm also prepared the front cab floor section for Adrian.